Ivory Coast launches new expansion phase at Azito CCGT power plant
Ivory Coast · ·
Groundbreaking ceremony: from L to R: CEO of Azito Energie Luc Aye, Spanish Ambassador in Cote d'Ivoire Ricardo Lopez-Aranda Jagu, Minister of Oil, Energy and Renewable Energy HE Mr Abdourahmane Cisse and UK Ambassador in Cote d'Ivoire HE Josephine Gauld.
The government of Ivory Coast has officially launched the construction of the Azito power plant expansion (phase 4) near Abidjan. The gas-fired Cpower plant, which already has a capacity of 460 MW, will be expanded by 253 MW capacity. The new phase is expected to produce power in 2021. The project is owned by Azito Energie, which…
The government of Ivory Coast has officially launched the construction of the Azito power plant expansion (phase 4) near Abidjan. The gas-fired Cpower plant, which already has a capacity of 460 MW, will be expanded by 253 MW capacity. The new phase is expected to produce power in 2021. The project is owned by Azito Energie, which is a joint venture between Globeleq and IPS (West Africa), an affiliate of the Aga Khan Fund for Economic Development.